Home Page
Products
Specifications
Installation Guides
Distributors
Literature
CAD Drawings
Corporate Info
Contact Us
|
Standon Model S96 Installation Guide
|
- Measure distance from bottom of flange to finish floor elevation.
Inspect flange edge surface and remove any casting bumps or tab's.
|
|
- Cut a piece of Sch. 40 steel pipe 4" less than the previously measured distance.
|
|
- Thread the collar assembly all the way onto the stud of the
flange saddle, then assemble the completed support including the cut pipe
section and position under the flange.
|
|
- Turn the collar assembly counter-clockwise until the saddle rests
snuggly under the flange connection, and in between the seismic tabs. Insure that
base assembly is positioned directly under piping system. Base may be secured to
the floor with ½" wedge anchors if required.
|
|
|